Pragmatic Agile Workshop

Why do we need Quality Management Plan

Discuss PMP doubts, tips and lesson learned. iZenBridge makes PMP® Certification easy
mannawar.hussain
Posts: 7
Joined: Fri Oct 14, 2016 2:14 pm

Why do we need Quality Management Plan

Postby mannawar.hussain Sun Mar 12, 2017 6:13 am

why quality management plan is required when there is already requirement documentation specified?
manishpn
Expert
Expert
Posts: 2125
Joined: Sat Jan 04, 2014 3:55 pm

Re: Why do we need Quality Management Plan

Postby manishpn Mon Mar 13, 2017 1:23 pm

Please elaborate this , not able to get this question
Br,
Manish P
PMP, PMI - ACP, SAFe Agilist
http://www.izenbridge.com/blog/7-effect ... ification/
mannawar.hussain
Posts: 7
Joined: Fri Oct 14, 2016 2:14 pm

Re: Why do we need Quality Management Plan

Postby mannawar.hussain Mon Mar 13, 2017 5:20 pm

Hi Manish,

Thanks for reply, could you please enlighten on configuration management plan. Where does it lies, when it is performed?

Regards,
VCAB
Participant
Participant
Posts: 71
Joined: Wed Dec 21, 2016 4:26 pm

Re: Why do we need Quality Management Plan

Postby VCAB Wed Mar 22, 2017 11:07 pm

I think to best answer this question is to know the difference of the plan and the document...

Requirement Traceability Matrix (within the Scope Mgt Process Group) is within the planning process group like is the Quality Mgt Plan. However, the identifies each requirement submitted by stakeholder be it product or project requirements and then those requirements are owned, traced or followed and is useful in controlling scope and these are verified in quality management process (control quality).

Quality Mgt Plan is a plan that describes how quality will be planned, tools and techniques that will be used and as well as those quality metrics and how controls will be put in place including the processes that will be put in place to implements a corrective, preventive or defect repair etc.
One is a document (requirement trace. matrix) and Qlty Mgt Plan (is a part of the project mgt plan).

So, your question was why do we need the quality mgt plan, and the requirement trace. matrix, well as you see the QMP provides your the process for managing quality including verifying the requirement, where as the trace matrix, does not provide a means to manage or control the requirements, however, the requirement mgt plan does that.

That is the little knowledge that I have...