do we really stop the production when occurs below situation?

A control Chart indicates the last 12 weights produced were outside the upper Control limit. What should the project manager do?

A. Work to better meet ISO 9000 standards.
B. Plan to rework the 12 weights.
C. Stop production.
D. Look for the nonrandom causes for the variations.

C is correct:
Data points outside the control limits indicates the process is out of control. and production should be stopped until a solution is found.

can any one clarify?

-Narsimha
signor_rk
Contributor
Contributor
Posts: 182
Joined: Wed Jun 18, 2014 3:47 pm

Re: Question on Control Chart

Postby signor_rk Sat Nov 29, 2014 1:42 pm

This has been discussed earlier in this forum. Please have a look at the following link:
viewtopic.php?f=3&t=1113&p=3825&hilit=Control+limit.#p3825

Thanks
Regards ,

Ranjit
bandarna
Beginner
Beginner
Posts: 29
Joined: Thu Aug 21, 2014 3:58 am

Re: Question on Control Chart

Postby bandarna Wed Dec 03, 2014 7:53 pm

Tanks Ranjit,
Some questions are rally tricky.