Configuration Management System

Exclusive forum for iZenBirdge PMP® clients
oberoi.amit
Contributor
Contributor
Posts: 125
Joined: Mon Mar 24, 2014 5:14 am

Configuration Management System

Postby oberoi.amit Mon May 19, 2014 11:29 pm

As per your video It is the tool, through which everybody can get the same version of information, how it is important in Integrated change control.? Is Configuration MGMT System is part of PMIS..
User avatar
saket
Site Admin
Site Admin
Posts: 3113
Joined: Sat Dec 07, 2013 10:37 pm

Re: Configuration Management System

Postby saket Tue May 20, 2014 8:45 am

As i said in last post do not think of system = tool, it is set of tools , guideline and processes , Configuration management system may exists even if the project not in action, because lot of configuration management activities are managed at product or organization level. But inside the project it is considered as part of or sub system of PMIS

Whenever such questions come, do check the glossary given in PMBOK its a great tool for such doubts

Configuration Management System. A subsystem of the overall project management system. It is a collection of formal documented procedures used to apply technical and administrative direction and surveillance to:
identify and document the functional and physical characteristics of a product, result, service, or component;
control any changes to such characteristics; record and report each change and its implementation status; and
support the audit of the products, results, or components to verify conformance to requirements. It includes the
documentation, tracking systems, and defined approval levels necessary for authorizing and controlling changes.


I also wrote blog on same topic, which you may like to refer to.

http://www.izenbridge.com/blog/what-is- ... ent-study/
Explore our online PMP Program , it makes PMP Easy :-) http://goo.gl/ZmD3xF

Image Image Image Image

Return to “PMP® Queries and Tips”

Who is online

Users browsing this forum: No registered users and 4 guests