Search found 1523 matches

by seema.sonkiya
Wed Mar 13, 2019 9:32 am
Forum: PMI-PBA Open Forum
Topic: change management in adaptive
Replies: 1
Views: 524

Re: change management in adaptive

Backlog management concept is applied in an Agile way (Adaptive Life Cycle) of delivering products, in this environment we need to address change requests which are frequently coming. And if we talk about Scrum Framework, the change management is taken care by process framework itself. Work is deliv...
by seema.sonkiya
Wed Mar 13, 2019 9:19 am
Forum: PMI-PBA Open Forum
Topic: change management steps in predictive life cycle
Replies: 1
Views: 495

Re: change management steps in predictive life cycle

Watch following video, it will answer all of your questions:

by seema.sonkiya
Mon Mar 11, 2019 10:23 am
Forum: PMI-PBA® Queries and Tips
Topic: Tripe constraints in Agile
Replies: 0
Views: 1253

Tripe constraints in Agile

Got following question: Plz confirm this point : In agile, time and cost are fixed, the scope is defined per itration In Agile, we start with the top-level idea and explore scope based on what is known related to that idea. In this way, we start with high-level requirements and scope of the product ...
by seema.sonkiya
Wed Mar 06, 2019 6:55 am
Forum: PMI-PBA® Queries and Tips
Topic: What is the meaning of risk spikes ?
Replies: 0
Views: 814

What is the meaning of risk spikes ?

Got following question: What is the meaning of risk spikes ? I knew the risk assessment process which is explained in pmp But for risk spikes i confused Risk spikes are those stories where risk are high and used to drive out uncertainties involved. A spike is an investigation to explore the answer o...
by seema.sonkiya
Sat Mar 02, 2019 5:03 pm
Forum: PMP® Resources
Topic: PMP micro learning videos Series - PMP Free Question 25: Approval of Scope
Replies: 0
Views: 848

PMP micro learning videos Series - PMP Free Question 25: Approval of Scope

The video starts with the question: You have recently started planning of the project and got a call from the sponsor to include one of the stakeholders as approving authority of scope, what would you do next? A. Meet the stakeholder and discuss scope baseline B. Meet the stakeholder to understand n...
by seema.sonkiya
Fri Mar 01, 2019 7:25 am
Forum: PMP® Resources
Topic: PMP micro learning videos Series - PMP Free Question 24: Delay in Scope Baseline
Replies: 0
Views: 578

PMP micro learning videos Series - PMP Free Question 24: Delay in Scope Baseline

The video starts with the question: It is taking a long time to get an agreement on the Scope baseline, and the project team is not utilized well, what do you do Next? A. Let the team start the work B. Release the team for sometime C. Raise a Risk that this may delay the project D. Find a way to dev...
by seema.sonkiya
Fri Mar 01, 2019 7:23 am
Forum: PMP® Resources
Topic: PMP micro learning videos Series - PMP Free Question 23: Challenge in Stakeholder Requirement
Replies: 0
Views: 477

PMP micro learning videos Series - PMP Free Question 23: Challenge in Stakeholder Requirement

This Video starts with the following question While capturing requirement with stakeholders, you observe it is challenging to explore without making assumptions, what is the best way to validate these assumptions? A. Record Assumptions in Requirement Document B. Add risks of wrong assumptions and pl...
by seema.sonkiya
Fri Mar 01, 2019 7:17 am
Forum: PMP® Resources
Topic: PMP micro learning videos Series - PMP Free Question 22: Difficult Requirement from Client
Replies: 0
Views: 461

PMP micro learning videos Series - PMP Free Question 22: Difficult Requirement from Client

This Video starts with the following question Your organization has a history of failed implementation attempt of a given requirement, and you see this new client asking for it again, what do you do next? A. Document the requirement. B. Add risk in risk register about this requirement. C. Share the ...
by seema.sonkiya
Fri Mar 01, 2019 7:13 am
Forum: PMP® Resources
Topic: PMP micro learning videos Series - PMP Free Question 21: Client Requirement
Replies: 0
Views: 470

PMP micro learning videos Series - PMP Free Question 21: Client Requirement

This Video starts with the following question You are collecting requirements from stakeholders and discover that many stakeholders are asking for things which are not included in the project scope as outlined in the project charter, what do you do next? A. Reject the requirement B. Raise a change r...
by seema.sonkiya
Fri Mar 01, 2019 7:11 am
Forum: PMP® Resources
Topic: PMP micro learning videos Series - PMP Free Question 20: Payment issues on accepted deliverables
Replies: 0
Views: 451

PMP micro learning videos Series - PMP Free Question 20: Payment issues on accepted deliverables

This Video starts with the following question You are doing project closure; the client's finance team does not understand accepted deliverable and finding it difficult to release the payment. What do you do next? a. Share WBS with the finance team. b. Share the Project Charter with the finance team...
by seema.sonkiya
Fri Mar 01, 2019 7:10 am
Forum: PMP® Resources
Topic: PMP micro learning videos Series - PMP Free Question 19: Payment term in Contract
Replies: 0
Views: 427

PMP micro learning videos Series - PMP Free Question 19: Payment term in Contract

This Video starts with the following question The client accepts the final deliverables, the payment term agreed in the contract makes you get paid only after six months, what do you do next? a. Complete the project closure b. Wait for money to receive for Project Closure c. Keep some critical membe...
by seema.sonkiya
Fri Mar 01, 2019 7:08 am
Forum: PMP® Resources
Topic: PMP micro learning videos Series - PMP Free Question 18: Payment issue for Change in Scope
Replies: 0
Views: 428

PMP micro learning videos Series - PMP Free Question 18: Payment issue for Change in Scope

This Video starts with the following question Your client is not willing to pay for the change in scope, and this issue was pending for long, what to do when it is heading for closure? A. Get stakeholders on the negotiation table B. Go ahead and close the project and keep this issue open for future ...
by seema.sonkiya
Fri Mar 01, 2019 7:06 am
Forum: PMP® Resources
Topic: PMP micro learning videos Series - PMP Free Question 17: Stakeholders Feedback at Project Closure
Replies: 0
Views: 425

PMP micro learning videos Series - PMP Free Question 17: Stakeholders Feedback at Project Closure

This Video starts with the following question During project closure, you are collecting feedbacks using a survey tool, and you find only 5% of the stakeholders provided the feedback, what do you do next? a. Check Organization Process Asset and Project Management Plan b. Develop a strategy to get at...
by seema.sonkiya
Fri Mar 01, 2019 7:03 am
Forum: PMP® Resources
Topic: PMP micro learning videos Series - PMP Free Question 16: Release Project team
Replies: 0
Views: 415

PMP micro learning videos Series - PMP Free Question 16: Release Project team

This Video starts with the following question While transferring the ownership of the project you discover that the client representative is only available after three months, your sponsor is expecting the release of the team. What would you do next? a. Close the project with documentation and relea...
by seema.sonkiya
Fri Mar 01, 2019 7:02 am
Forum: PMP® Resources
Topic: PMP micro learning videos Series - PMP Free Question 15: Risk related to Documentation
Replies: 0
Views: 346

PMP micro learning videos Series - PMP Free Question 15: Risk related to Documentation

This video starts with the question You are transferring the ownership of the project and realize that some part of the documentation which is needed to operate the system is missing, the client is not aware of it. What do you do next? A. Inform sponsor about the risk. B. Perform impact analysis. C....
by seema.sonkiya
Fri Mar 01, 2019 7:00 am
Forum: PMP® Resources
Topic: PMP micro learning videos Series - PMP Free Question 14: Unsatisfied Stakeholders
Replies: 0
Views: 332

PMP micro learning videos Series - PMP Free Question 14: Unsatisfied Stakeholders

The video starts with the question : During Project closure you discover that majority of stakeholders are not happy with accepted deliverables, what do you do next? A. Raise a Change Request to improve deliverables B. Go ahead with project closure C. Record the learning in a lesson learned document...
by seema.sonkiya
Fri Mar 01, 2019 6:58 am
Forum: PMP® Resources
Topic: PMP micro learning videos Series - PMP Free Question 13: Ownership issue at Client side
Replies: 0
Views: 335

PMP micro learning videos Series - PMP Free Question 13: Ownership issue at Client side

The video starts with the question: You have obtained the final acceptance of the project deliverables. You realize that the client has no one ready to take the ownership of deliverables. What would you do next? A. Propose a support contract B. Go ahead with Project Closure C. Inform the Sponsor D. ...
by seema.sonkiya
Fri Mar 01, 2019 6:56 am
Forum: PMP® Resources
Topic: PMP micro learning videos Series - PMP Free Question 12: Assignment of new Client
Replies: 0
Views: 306

PMP micro learning videos Series - PMP Free Question 12: Assignment of new Client

The video starts with the question : You are working for the external project, and new client representative got assigned, the new person has new ideas and not accepting your final deliverables. What would you do next? A. Raise a risk for project delay B. Ask the client to raise the change request C...
by seema.sonkiya
Fri Mar 01, 2019 6:54 am
Forum: PMP® Resources
Topic: PMP micro learning videos Series - PMP Free Question 11: Confirmation on final deliverables
Replies: 0
Views: 305

PMP micro learning videos Series - PMP Free Question 11: Confirmation on final deliverables

The video starts with the question : You approached the client with final deliverables to confirm achievement of the project scope. Your client says it’s incomplete, which of the following document can help you the most? A. Project Charter B. Project Management Plan C. Requirements Documentation D. ...
by seema.sonkiya
Fri Mar 01, 2019 6:50 am
Forum: PMP® Resources
Topic: PMP micro learning videos Series - PMP Free Question 10: Approval of project charter
Replies: 0
Views: 305

PMP micro learning videos Series - PMP Free Question 10: Approval of project charter

The video starts with the question : Your project needs the purchase of equipment which has two months lead time and this equipment is critical for your project work. The project charter approval will take one-month time. What should you do? A. Go ahead and order the equipment B. Speedup the Project...
by seema.sonkiya
Fri Mar 01, 2019 6:43 am
Forum: PMP® Resources
Topic: PMP micro learning videos Series - PMP Free Question 9: Stakeholders agreement on a common strategy
Replies: 0
Views: 308

PMP micro learning videos Series - PMP Free Question 9: Stakeholders agreement on a common strategy

The video starts with the question : Stakeholders are not in agreement on common strategy and approach for implementing the project while the client is insisting on getting started with the project immediately, what should you do? A. Get started with the project since the client is asking B. Inform ...
by seema.sonkiya
Fri Mar 01, 2019 6:38 am
Forum: PMP® Resources
Topic: PMP micro learning videos Series - PMP Free Question 8: Stakeholders not in agreement
Replies: 0
Views: 305

PMP micro learning videos Series - PMP Free Question 8: Stakeholders not in agreement

The video starts with the question : The video starts with the question : Two out of five stakeholders are not in agreement on the elements of the project charter, what do you do next? A. Escalate the issue to sponsor B. Go ahead to seek approval from the sponsor C. Facilitate the meeting to agree o...
by seema.sonkiya
Fri Mar 01, 2019 6:34 am
Forum: PMP® Resources
Topic: PMP micro learning videos Series - PMP Free Question 7: Contract payment terms not defined
Replies: 0
Views: 281

PMP micro learning videos Series - PMP Free Question 7: Contract payment terms not defined

The video starts with the question : Your company has signed a contract with an external customer for executing the project, and you find that the contract payment terms are not well defined, what do you do next? A. Understand the Contract Change Management Process B. Propose New Payment terms to th...
by seema.sonkiya
Fri Mar 01, 2019 6:32 am
Forum: PMP® Resources
Topic: PMP micro learning videos Series - PMP Free Question 6: Discovered nonalignment during Initiation
Replies: 0
Views: 310

PMP micro learning videos Series - PMP Free Question 6: Discovered nonalignment during Initiation

The video starts with the question : During project initiation, while validating the project alignment with the organization strategy, you discover nonalignment, what is your next step? A. Wait for the project charter B. Write your findings to Stakeholders C. Put project charter preparation on hold ...
by seema.sonkiya
Fri Mar 01, 2019 6:30 am
Forum: PMP® Resources
Topic: PMP micro learning videos Series - PMP Free Question 4: Assessment of the Lesson Learned
Replies: 0
Views: 275

PMP micro learning videos Series - PMP Free Question 4: Assessment of the Lesson Learned

You are doing an assessment of the lesson learned from previous projects to support the feasibility of new product or services, what will be your next step Here are four options…. A. Prepare Business Case B. Prepare Project Charter C. Prepare Requirement Documentation D. Prepare/Update Assumptions L...
by seema.sonkiya
Fri Mar 01, 2019 6:23 am
Forum: PMP® Resources
Topic: PMP micro learning videos Series - PMP Free Question 5: Discovered risks during Initiation
Replies: 0
Views: 272

PMP micro learning videos Series - PMP Free Question 5: Discovered risks during Initiation

The video starts with the question Question: During project initiation, while validating the project alignment with the organization strategy you discover many risks, what Next you should do? Here are four options A. Discuss in the upcoming stakeholder meeting B. Defer the risk for planning C. Recor...
by seema.sonkiya
Fri Mar 01, 2019 6:19 am
Forum: PMP® Resources
Topic: PMP micro learning videos Series - PMP Free Question 3: Identify high-level risks
Replies: 0
Views: 302

PMP micro learning videos Series - PMP Free Question 3: Identify high-level risks

The video starts with the question While proposing the implementation strategy for the project, you are also identifying high-level risks, where will you record these risks? A. Project Business Case B. Project Charter C. Risk Register D. Project Management Plan Project Business Case – It is a docume...
by seema.sonkiya
Fri Mar 01, 2019 6:17 am
Forum: PMP® Resources
Topic: PMP micro learning videos Series - PMP Free Question 2: Identify Stakeholders
Replies: 0
Views: 283

PMP micro learning videos Series - PMP Free Question 2: Identify Stakeholders

The video starts with the question Which document can help you the most while identifying stakeholders the first time in the project? Select the best A. Business Case B. Project Charter C. Agreements D. Project Management Plan Followed by possible reasons for each option. Option A -The business case...
by seema.sonkiya
Fri Mar 01, 2019 6:12 am
Forum: PMP® Resources
Topic: PMP micro learning videos Series - PMP Free Question 1: Role of a Project Manager
Replies: 0
Views: 291

PMP micro learning videos Series - PMP Free Question 1: Role of a Project Manager

The video starts with the question “Which of the following represents the role of Project Manager, select the BEST answer?”

by seema.sonkiya
Tue Feb 26, 2019 11:04 am
Forum: PMI-ACP® Open Forum
Topic: PMI-ACP exam content
Replies: 1
Views: 590

Re: PMI-ACP exam content

In PMi-ACP, main focus is on Scrum, XP, Kanban, and Lean principles.

For insight on ACP success stories, please follow link: viewforum.php?f=29
by seema.sonkiya
Tue Feb 26, 2019 11:00 am
Forum: PMI-ACP® Queries and Tips
Topic: Work BreakDown Structure (WBS) in Agile
Replies: 1
Views: 520

Re: Work BreakDown Structure (WBS) in Agile

There is no "No" to WBS in Agile. You can create high-level WBS where upcoming work is explored in detail, and later work is explained at a high level.

Agile is about four values and 12 principles, as long as your work is aligned with these, you are Agile.
by seema.sonkiya
Fri Feb 15, 2019 7:04 am
Forum: PMI-ACP® Queries and Tips
Topic: ESTIMATING VELOCITY
Replies: 5
Views: 843

Re: ESTIMATING VELOCITY

have made a order of planning as below during speculation phase : Create a Candidate Feature List Create a USER STORY Estimating USER STORY Prioritizing USER STORY Creating PB Creating STORYMAP Create RELEASE PLAN Create Roadmap from the collection of storymaps.... A Roadmap is top-level planning, ...
by seema.sonkiya
Fri Feb 15, 2019 6:44 am
Forum: PMI-ACP® Queries and Tips
Topic: ESTIMATING VELOCITY
Replies: 5
Views: 843

Re: ESTIMATING VELOCITY

2. If we have already estimating velocity during estimation itself , why we need to estimate the velocity again in Release planning ?


Velocity is not baselined, it is emerged based on learning.
by seema.sonkiya
Fri Feb 15, 2019 5:45 am
Forum: PMI-ACP® Queries and Tips
Topic: ESTIMATING VELOCITY
Replies: 5
Views: 843

Re: ESTIMATING VELOCITY

1. Do we need to follow the same 3 method when we calculate velocity during estimation ? You use the method which is most suitable. Like, when you start, you can rely on the historic velocity with the same team. In case there is no historical data for the same team, then run an iteration can work. ...
by seema.sonkiya
Wed Feb 13, 2019 10:10 am
Forum: PMI-ACP® Queries and Tips
Topic: ESTIMATING VELOCITY
Replies: 5
Views: 843

Re: ESTIMATING VELOCITY

I did not get your question. What is the difference in getting an idea during estimation or release planning?
by seema.sonkiya
Tue Feb 12, 2019 10:23 am
Forum: PMI-PBA® Exam Lessons – Success Stories
Topic: Passed PMI-PBA on Feb 8th 2019
Replies: 1
Views: 681

Re: Passed PMI-PBA on Feb 8th 2019

Congratulations Savita!! And thanks for choosing iZenBridge in your success.
by seema.sonkiya
Fri Feb 08, 2019 6:49 am
Forum: PMP® Exam Lessons – Success Stories
Topic: How I Earned My PMP Certification!
Replies: 4
Views: 1159

Re: How I Earned My PMP Certification!

Congratulations chetan!! Thanks for choosing iZenBridgde in your success.
by seema.sonkiya
Mon Feb 04, 2019 7:45 am
Forum: PMI-PBA® Queries and Tips
Topic: PMI PBA Preparation material
Replies: 2
Views: 684

Re: PMI PBA Preparation material

You don't need to refer to reference books. We have included all required material in the course. The PMI offers two main reads: 1. PMI Guide to Business Analysis 2.. Business Analysis Practice Guide The course is completely aligned with PMI-PBA content outline. Let me know where you find irrelevant...
by seema.sonkiya
Mon Feb 04, 2019 7:38 am
Forum: PMI-PBA® Queries and Tips
Topic: PMI PBA Preparation material
Replies: 2
Views: 684

Re: PMI PBA Preparation material

As an iZenBridge customer, I suggest to post question in the exclusive PBA area.

I am moving this post there.
by seema.sonkiya
Fri Jan 25, 2019 12:45 pm
Forum: PMI-ACP® Queries and Tips
Topic: Financial assessment metrics...
Replies: 3
Views: 1268

Re: Financial assessment metrics...

You can take in this way - These tools are used to forecast to weigh benefits over cost.
by seema.sonkiya
Fri Jan 25, 2019 12:40 pm
Forum: PMI-ACP® Queries and Tips
Topic: Generic Agile Role...
Replies: 3
Views: 1890

Re: Generic Agile Role...

It does not relate to Scrum. In Scrum, three roles are mentioned and these have to be part of the Scrum. In XP, many roles like Domain expert, Business Analysts roles are mentioned, and if only one person can handle these different roles, then there is no need to have a separate assignment. One pers...
by seema.sonkiya
Fri Jan 25, 2019 12:27 pm
Forum: PMI-ACP® Queries and Tips
Topic: Agile Roles...
Replies: 4
Views: 1985

Re: Agile Roles...

Project Manager roles comes in the umbrella of "Coach" role.

Agile Manager role is a generic term and does not belong to any specific framework.
by seema.sonkiya
Fri Jan 25, 2019 11:24 am
Forum: PMI-ACP® Queries and Tips
Topic: Agile Roles...
Replies: 4
Views: 1985

Re: Agile Roles...

Can you explain this equation in words? As per my view: It is important that Scrum Master live the behavior of servant leadership and instead of command and control, SM believes more on influencing. He works to inspire rather than direction based on position and power. He works to bring best from te...
by seema.sonkiya
Thu Jan 24, 2019 7:05 am
Forum: PMI-PBA® Queries and Tips
Topic: Viable vs Feasible
Replies: 1
Views: 1595

Re: Viable vs Feasible

Sorry for the delay in the response, I was on holidays. Have you gone through the following video from the course: 9. Recommend Actions to Address Business Need from Need from chapter 6 "Need Assessment" It has a detailed elaboration of the conceit. Let me brief here: We need to do a feasi...
by seema.sonkiya
Wed Jan 23, 2019 11:09 am
Forum: PMP® Exam Lessons – Success Stories
Topic: Passed PMP Exam on 02.Dec.2018
Replies: 4
Views: 1576

Re: Passed PMP Exam on 02.Dec.2018

Ismayil after consistent feedbacks for mock questions, we have updated them entirely to match the current trend of examination.
by seema.sonkiya
Wed Jan 23, 2019 11:04 am
Forum: PMI-ACP® Open Forum
Topic: Mike Griffiths PDF
Replies: 4
Views: 7031

Re: Mike Griffiths PDF

If you have iZenBridge customer, please write to support@izenbridge.com
by seema.sonkiya
Wed Jan 23, 2019 10:58 am
Forum: PMP® Exam Lessons – Success Stories
Topic: Passed PMP Exam - 18th Jan 2019
Replies: 2
Views: 1089

Re: Passed PMP Exam - 18th Jan 2019

Congratulations Bharathi Raghavan. Thanks for sharing your insightful exam success story.
by seema.sonkiya
Wed Jan 23, 2019 10:53 am
Forum: PMI-ACP® Exam Lessons – Success Stories
Topic: Passed PMI-ACP Yesterday!!
Replies: 3
Views: 1483

Re: Passed PMI-ACP Yesterday!!

Yes, we can discuss. Based on your LinkedIn profile, I feel you can pursue ICP-ACC now,

Let's discuss offline.
by seema.sonkiya
Tue Jan 22, 2019 10:40 am
Forum: PMI-ACP® Open Forum
Topic: User stories related
Replies: 1
Views: 634

Re: User stories related

This question is little sense to me. How estimation points and value of user stories are related?

Please clarify your question.

For estimation of user stories, you can watch following video:

Go to advanced search