Sample template for Request for proposal

Dear Saket Sir, Jumping onto my question directly :-) Lets assume that there is a company ABC and it has customer XYZ. XYZ has asked for "Request for Proposal (RFP)" Can you please help me out with sample document or template for RFP I am Assuming in the above scenario of external customer...
by ajaynit
Thu Jul 12, 2018 11:21 am
Forum: PMP® Open Forum
Topic: PMP Related Sample documents
Replies: 0
Views: 449

PMP Related Sample documents

Dear Friends, Lets assume that there is a company ABC and it has customer XYZ. XYZ has asked for "Request for Proposal (RFP)" Can someone please help me out with sample document or template for RFP I am Assuming in the above scenario of external customer,this RFP should contain sections fo...
by ajaynit
Wed Apr 25, 2018 5:21 am
Forum: Questions about Our classes, Online Classes, Webinars, Booking, Payment etc.
Topic: PMP Course
Replies: 1
Views: 7566

PMP Course

Dear, I Am Ajay and have purchased PMP online training programs few months and now the subscription has expired. Though i have cleared PMP certification few months back already with Above target in all Domain but still want to keep going through those PMP training materials every now and then. can y...
by ajaynit
Wed Mar 07, 2018 5:21 am
Forum: PMP® Exam Lessons – Success Stories
Topic: Got my PMP Credential !!
Replies: 2
Views: 1039

Re: Got my PMP Credential !!

Congratulations on your momentous achievement Rohini ! Now you can forget all your sleepless nights :-)
by ajaynit
Wed Mar 07, 2018 5:18 am
Forum: PMP® Exam Lessons – Success Stories
Topic: Cleared PMP in 1st Attempt with Above Target in all Domains
Replies: 4
Views: 1382

Re: Cleared PMP in 1st Attempt with Above Target in all Domains

Congratulations Aloke on what you have accomplished! Everything you want also wants you :-)
Time for celebrations :-)
by ajaynit
Tue Feb 27, 2018 4:26 am
Forum: PMP® Open Forum
Topic: Prep Question
Replies: 2
Views: 760

Re: Prep Question

pouring my experience if that can help.... thoroughout the PMP preparation i used to read in blogs/articles etc that one should go through this question bank that question bank then rita then what not and honestly i used to feel am i committing some blunder by not touching anything other than Saket'...
by ajaynit
Wed Feb 07, 2018 5:00 am
Forum: PMP® Exam Lessons – Success Stories
Topic: Passed PMP on 01 feb 2018 with ABOVE TARGET in all Domain
Replies: 6
Views: 2166

Re: Passed PMP on 01 feb 2018 with ABOVE TARGET in all Domain

Thank you so much..All because of having mentor like you Manish Sir and wishes from fellow Aspirants like Kushal/Rohini & Pmpaspire..
by ajaynit
Mon Feb 05, 2018 4:13 am
Forum: PMP® Open Forum
Topic: Change request
Replies: 2
Views: 746

Re: Change request

-Evaluate impact
-Explore ways to reduce its impact (trade offs)
-CCB (key stakeholders should be part of it) reviews and approves/rejects
by ajaynit
Fri Feb 02, 2018 3:29 am
Forum: PMP® Exam Lessons – Success Stories
Topic: Passed PMP on 01 feb 2018 with ABOVE TARGET in all Domain
Replies: 6
Views: 2166

Passed PMP on 01 feb 2018 with ABOVE TARGET in all Domain

Dear Friends, Happy to share that i cleared PMP exam on 01 feb with ABOVE TARGET rating in all domain. Big thanks to below people whom i owe my PMP certification Manish Sir : Thanks for showing that extreme level of patience while dealing with my impulsive questions every now and then. wish i could ...
by ajaynit
Wed Jan 31, 2018 1:11 pm
Forum: PMP® Queries and Tips
Topic: SV% & CV%
Replies: 5
Views: 1188

Re: SV% & CV%

Del.png
Del.png (30.26 KiB) Viewed 1155 times



Note: Feel free to avoid this question if its not adding value to you :-)
by ajaynit
Tue Jan 30, 2018 5:14 am
Forum: PMP® Exam Lessons – Success Stories
Topic: Passed PMP in fist attempt on 28.01.2018
Replies: 4
Views: 1240

Re: Passed PMP in fist attempt on 28.01.2018

Hi sknishad , congratulations on your achievement. thanks for thanking me (if the ajay you mentioned in your post is me). can you please suggest on glossary? like 1. how many questions you faced directly coming out of glossary? 2. going through each one is difficult (even if you go through by unders...
by ajaynit
Tue Jan 30, 2018 5:07 am
Forum: PMP® Queries and Tips
Topic: SV% & CV%
Replies: 5
Views: 1188

Re: SV% & CV%

not sure if i didn't understand your answer or you didn't understand my question :-)

i am asking for CV and SV percentage formulas not CPI/SPI formulas.

if you see the izen mocks, you will find lot of question on CV/SV percentage calculations
by ajaynit
Mon Jan 29, 2018 11:46 am
Forum: PMP® Queries and Tips
Topic: SV% & CV%
Replies: 5
Views: 1188

SV% & CV%

Hi,

Please confirm if these formulas are correct:

CV%= CV/EV

SV% =SV/PV


i tried searching whole forum but couldn't end up with something which is understandable by me...


Best Regards
Ajay
by ajaynit
Mon Jan 29, 2018 8:56 am
Forum: PMP® Open Forum
Topic: Sigma
Replies: 2
Views: 652

Re: Sigma

based on how much i know: 6 sigma means accuracy level of 99.9 3 sigma means accuracy level of 99.73 1 sigma means accuracy level of 68.27 e.g if its 1 sigma then you are going to have (100-68.27) = 31.73 errors out of 100 if its 3 sigma then you are going to have (100-99.73) = .27 errors out of 100...
by ajaynit
Thu Jan 25, 2018 7:52 am
Forum: PMP® Queries and Tips
Topic: Stakeholder and decision making
Replies: 5
Views: 1442

Re: Stakeholder and decision making

what should be the answer here? if answer is A then as sures said its highlighted in question that stakholders are already explained about its then why again to follow again approach mentioned in option A ..
by ajaynit
Wed Jan 24, 2018 4:13 am
Forum: PMP® Queries and Tips
Topic: Independent estimate: Quampus question
Replies: 2
Views: 1670

Re: Independent estimate: Quampus question

Hi Namita,

with the above logic , why cant answer be :
Procurement SOW created by buyer was clear but seller understood it incorrectly resulting lower bids



thanks for clarifying, it will help me in making my concept clear in one of the most confusing area of procurement for me
by ajaynit
Mon Jan 22, 2018 4:11 am
Forum: PMP® Open Forum
Topic: Schedule for Preparation - Working Mom
Replies: 8
Views: 1788

Re: Schedule for Preparation - Working Mom

thanks Kushal :-)
by ajaynit
Mon Jan 22, 2018 4:10 am
Forum: PMP® Open Forum
Topic: During PMP exam do they provide scratch paper?
Replies: 6
Views: 1478

Re: During PMP exam do they provide scratch paper?

thanks Kushal & balaji.
your inputs are great help..

good that you told i need to ask for calculator beforehand :-)
by ajaynit
Sat Jan 20, 2018 12:50 pm
Forum: PMP® Open Forum
Topic: During PMP exam do they provide scratch paper?
Replies: 6
Views: 1478

During PMP exam do they provide scratch paper?

Hi, just wondering, for those of you who took the exam, do you recall how much scratch paper is given? Is it like a couple sheets of paper A4 size or just little note cards or??? I am building my "brain dump" and I was just thinking, maybe I won't have enough room! also can carry my own pe...
by ajaynit
Fri Jan 19, 2018 7:10 am
Forum: PMP® Open Forum
Topic: Walk-through v/s audit
Replies: 1
Views: 520

Re: Walk-through v/s audit

My understanding: Audit is formal & done by internal Quality assurance dept of organization or by external auditors but is for sure done by people/group not from project.------my project got audited last week and it was red in some areas and you can guess what might have happened after that :-)...
by ajaynit
Fri Jan 19, 2018 3:32 am
Forum: PMP® Open Forum
Topic: PMBOK GUIDE 5
Replies: 1
Views: 719

Re: PMBOK GUIDE 5

project life cycle could be predictive, iterative/incremental,adaptive/agile
project management life cycle and its related processes are initiation/planning/execution/monitoring/closing

both are completely different stuffs
by ajaynit
Wed Jan 17, 2018 4:05 am
Forum: PMP® Open Forum
Topic: Schedule for Preparation - Working Mom
Replies: 8
Views: 1788

Re: Schedule for Preparation - Working Mom

This is Quite a interesting question and being a regular izenbridge forum visitor i couldn't resist myself from responding to this question. to speak about myself, i do it whenever i have time.. no fixed timings . though the planning is done as 2-3 hrs on weekdays (evenings/night) and 3-5 hrs on wee...
by ajaynit
Mon Jan 15, 2018 7:05 am
Forum: PMP® Open Forum
Topic: Comm Management
Replies: 1
Views: 710

Re: Comm Management

by ajaynit
Sun Jan 14, 2018 5:12 am
Forum: PMP® Open Forum
Topic: Responsibilty of Project Funding / Procurement Audit ( Very Important)
Replies: 2
Views: 841

Re: Responsibilty of Project Funding / Procurement Audit ( Very Important)

1st question's answer:
option 4

1st question's answer:
option 2

Nazrul, whats correct answer?
by ajaynit
Sat Jan 13, 2018 4:47 pm
Forum: PMP® Queries and Tips
Topic: Question #4 : analytical techniques evaluates investment
Replies: 2
Views: 1102

Re: Question #4 : analytical techniques evaluates investment

I go with discounted cash flow.. Manish sir, Correct answer plaese
by ajaynit
Sat Jan 13, 2018 4:44 pm
Forum: PMP® Queries and Tips
Topic: Question #1 political unrest in the vendor's location
Replies: 2
Views: 912

Re: Question #1 political unrest in the vendor's location

I go with c.. What's correct answer Manish sir?
by ajaynit
Sat Jan 13, 2018 4:39 pm
Forum: PMP® Open Forum
Topic: Close Project/Phase
Replies: 1
Views: 947

Re: Close Project/Phase

A
by ajaynit
Fri Jan 12, 2018 6:40 am
Forum: PMP® Queries and Tips
Topic: work around and fallback is confusing me :-(
Replies: 1
Views: 952

work around and fallback is confusing me :-(

i have a risk. i accepted it and did active acceptance means planned for contingency risk occurred intial response (planned one, i.e contigency plan) to risk didnt go well so i switched to workaround (not a planned one). workaround didn't go well i switched to fall back plan (Planned one) means ulti...
by ajaynit
Fri Jan 12, 2018 4:33 am
Forum: PMP® Queries and Tips
Topic: Risk trigger is identified during which process?
Replies: 1
Views: 801

Risk trigger is identified during which process?

Risk trigger is identified during which process?
as per my interpretation of PMBOK its identified during "identify risk process" as well as "Plan risk response process"?

any expert advice please?
by ajaynit
Thu Jan 11, 2018 4:51 pm
Forum: PMP® Queries and Tips
Topic: Manish Sir Please help..as per PMBOK, Page 346,Contingency Plans or fallback plans are same..
Replies: 1
Views: 781

Manish Sir Please help..as per PMBOK, Page 346,Contingency Plans or fallback plans are same..

as per PMBOK, Page 346,Contingency Plans or fallback plans are mentioned as same.. 11.5.2.3 - last statement. Question 1:contingency is already part of positive and negative (Accept ) risk response strategy then why is it again separately mentioned under contingent response strategies Questions 2: h...
by ajaynit
Thu Jan 11, 2018 4:39 pm
Forum: PMP® Queries and Tips
Topic: risk response/contingency plan/workaround/fallback
Replies: 1
Views: 800

risk response/contingency plan/workaround/fallback

Manish Sir, i have illustrated my understanding below, please confirm if i am good here. Scenario: i am managing a event and calling 10 speakers from all over globe all have accepted the invitation . risk: looking at lesson learnt from previous events ,atleast one speaker may turn up only on last da...
by ajaynit
Thu Jan 11, 2018 3:47 pm
Forum: PMP® Queries and Tips
Topic: Any recommendations for PMP Mocks ?
Replies: 2
Views: 789

Re: Any recommendations for PMP Mocks ?

thanks for your valuable inputs kushal, glad to see you back on forum
i liked your time frame & locked (incuboard) mobile suggestion. :-) for sure i am going to follow that.
thanks again.
by ajaynit
Thu Jan 11, 2018 6:34 am
Forum: PMP® Queries and Tips
Topic: Any recommendations for PMP Mocks ?
Replies: 2
Views: 789

Any recommendations for PMP Mocks ?

Please recommend some good mocks for PMP.
one is izenbridge's KA wise, Process group wise & full length simulations
other than these can you recommend me some good mocks Please.

Please send the Mocks to my email ID ajay.nit@gmail.com


Best Regards
Ajay
by ajaynit
Thu Jan 11, 2018 5:45 am
Forum: PMP® Queries and Tips
Topic: Manish sir pls help--CR versus project document updates
Replies: 5
Views: 1338

Re: Manish sir pls help--CR versus project document updates

i got another or may be same query on same line while re-visiting risk management area: i interpret that PMBOK ITTO table assumes that when we are doing risk management at first then scope baseline is ready but no other baselines are ready yet. Plan risk response says that due to this risk planning ...
by ajaynit
Thu Jan 11, 2018 3:53 am
Forum: PMP® Open Forum
Topic: Defect Repair
Replies: 1
Views: 535

Re: Defect Repair

tricky part is its just showing sign of wear and tear but nothing has happened yet.Production lines are working fine. no production failures. so there is no defect as such as of now . Because of wear and tear some problem is going to happen in future is not a characteristic of defect. Question is te...
by ajaynit
Thu Jan 11, 2018 3:45 am
Forum: PMP® Open Forum
Topic: How to Calculate Loaded Hourly Rate
Replies: 2
Views: 853

Re: How to Calculate Loaded Hourly Rate

one of the tricky part of this question is "overhead costs are 50 % of this total cost" My calculation: Wage of the worker = $ 20/ hour Fringe Benefit = 10% of 20 = $2 /hour Over Head 50% of total cost i.e 50% of (20+2) =$ 11 /hour Loaded hourly rate = $ ( 20+2+11) = $ 33 Answer D. Note:I ...
by ajaynit
Tue Jan 09, 2018 5:58 am
Forum: PMP® Queries and Tips
Topic: reserve analysis as a tool for control cost but not for control schedule
Replies: 1
Views: 530

reserve analysis as a tool for control cost but not for control schedule

as per PMBOK , reserve analysis is one of the tool for controlling cost but nothing is mentioned about reserve analysis can be used for controlling schedule.. I feel it can be even used as tool for controlling schedule? because one need to see how much time of contingency reserve is still available....
by ajaynit
Mon Jan 08, 2018 8:07 am
Forum: PMP® Open Forum
Topic: trade-off vs compromise
Replies: 1
Views: 564

Re: trade-off vs compromise

Scenario: customer wanted double of what was planned . trade-0ff: Being a PM you asked him to pay 2/3 times of what was planned .both party agreed and all happy. Compromise Being a PM you asked him to pay 2/3 times of what was planned Both party didnt agree but both side discussed and arrived a sol...
by ajaynit
Mon Jan 08, 2018 5:04 am
Forum: PMP® Open Forum
Topic: some knowladge gap i have
Replies: 2
Views: 741

Re: some knowladge gap i have

first i thought of typing the responses but seems like Monday is not going to allow me to do that...
but I can discuss in details about these using sync communication mode.
by ajaynit
Sun Jan 07, 2018 6:25 pm
Forum: PMP® Queries and Tips
Topic: Manish sir pls help--CR versus project document updates
Replies: 5
Views: 1338

Re: Manish sir pls help--CR versus project document updates

thanks Manish sir, sorry bothering you too much during your holidays..
by ajaynit
Sun Jan 07, 2018 5:05 pm
Forum: PMP® Queries and Tips
Topic: Manish sir pls help--CR versus project document updates
Replies: 5
Views: 1338

Manish sir pls help--CR versus project document updates

many processes have output as CR, mostly control and execution processes and only one from planning (plan Procurement mngmt). CR ultimately leads to Project management plan (relevant subsidiary plan) update. ideally this way... Process-->Raise CR--> Perform Integrated Change control --> Approved CR-...
by ajaynit
Sun Jan 07, 2018 11:05 am
Forum: PMP® Queries and Tips
Topic: Manish sir any expert advice here---PMBOK 5th edition---page no 417 onwards
Replies: 1
Views: 610

Manish sir any expert advice here---PMBOK 5th edition---page no 417 onwards

i am mainly focusing till page 417 of pmbok i.e till the end of last chapter stakeholder management.. after that there is annex A1, appendix x1 and so on which i have not touch atall but have just gone through glossary.. can someone advise please if i am missing on something here by leaving things a...
by ajaynit
Sun Jan 07, 2018 10:28 am
Forum: PMP® Queries and Tips
Topic: Work Performance Reports & Develop PM plan
Replies: 2
Views: 952

Re: Work Performance Reports & Develop PM plan

let me try answering with whatever limited knowledge i have, others can correct me if needed. you made a plan for shopping on sunday (07 Jan) 1 pm-7pm .so shopping is your project and you have made project management plan for shopping like : scope as 3 Gowns(Plan scope mngmt) budget as 9k (Plan cost...
by ajaynit
Sat Jan 06, 2018 2:03 pm
Forum: PMP® Exam Lessons – Success Stories
Topic: Ohhhh.....Yesssss........ 1st Success story of 2018
Replies: 2
Views: 863

Re: Ohhhh.....Yesssss........ 1st Success story of 2018

My heartiest congratulations on your achievement Balaji!

i am sure Many like me are waiting to hear more from you :-)
by ajaynit
Thu Jan 04, 2018 7:58 am
Forum: PMP® Queries and Tips
Topic: not able to upload an excel file
Replies: 1
Views: 564

not able to upload an excel file

Hi, I have prepared a sample risk register in excel. i have identified stakeholders (i.e first column of stakeholder register) and then i have done stake holder analysis using power interest matrix to classify stakeholders. now based on this i want to fill up the remaining columns i.e classification...
by ajaynit
Thu Jan 04, 2018 5:38 am
Forum: PMP® Queries and Tips
Topic: Project Stakeholders
Replies: 1
Views: 646

Project Stakeholders

in the introduction video of stakeholder management, saket refers people surrounding Project team as stakeholders like customer, sponsor,functional manager etc.. so with that logic Project team will include (from IT industry prospective) poeple like developers, testers, architects etc. now in anothe...
by ajaynit
Tue Jan 02, 2018 7:52 am
Forum: PMP® Open Forum
Topic: Pert Estimate
Replies: 1
Views: 509

Re: Pert Estimate

sorry for responding without having any opinion on this but looking (Highlevel) at question couldnot resist to share that i am feeling a bit nervous thinking are these going to be PMP real exams question standards? :cry: :cry: :cry:
by ajaynit
Mon Jan 01, 2018 12:09 pm
Forum: PMP® Queries and Tips
Topic: Risk Ranking,Rating,Score,Exposure are all same?
Replies: 3
Views: 745

Re: Risk Ranking,Rating,Score,Exposure are all same?

thanks Manish Sir .you made it simple for me...

can you please relate (Similarity or diffeence) risk exposure too with these three terms ?
by ajaynit
Sat Dec 30, 2017 3:22 pm
Forum: PMP® Queries and Tips
Topic: Risk Ranking,Rating,Score,Exposure are all same?
Replies: 3
Views: 745

Risk Ranking,Rating,Score,Exposure are all same?

are these terms all same:

Risk Ranking,Rating,Score,Exposure?
by ajaynit
Sat Dec 30, 2017 1:22 pm
Forum: PMP® Open Forum
Topic: Qualitative and Quantitative risk assesment
Replies: 0
Views: 436

Qualitative and Quantitative risk assesment

key input for "Identify risk" process comes from all knowledge areas and we get risk register as output.. This risk register is i/p to qualitative risk assessment and other key i/p is scope baseline (My question: why again scope baseline mentioned here separately when it was anyways consid...

Go to advanced search